Remove 2020 Remove Closeout Remove Handover
article thumbnail

How Much is Poor Construction Document Management Costing You? 

Autodesk Construction Cloud

trillion in 2020. Unfinished Closeout Packages Closeout packages should include the latest versions of all drawings and files related to the layout, construction, and internal systems of a structure. A large number of rework requests are generated due to a lack of version control on drawings and plans.

article thumbnail

40 Under 40: Champions of Construction 2022

Autodesk Construction Cloud

He keeps an eye on all project components, ensuring that a smooth handover and as-built model are achieved on all new projects. . She was part of the team that executed the 950 Market job in San Francisco, and she was there from excavation to closeout.