The Los Angeles County Museum of Art: Enormous Complexity Under a Veil of Simplicity
ENR Construction
JUNE 16, 2025
LACMA locked in its long-term debt cost in November 2020. The building can move 5 ft laterally in any direction thanks to a state-of-the-art seismic protection system with 56 base isolators. The team went on to install 400 more piles, 240 micropiles and 40 continuous flight auger piles. That also required repermitting.
Let's personalize your content