Remove 2026 Remove HVAC Systems Remove Wall Systems
article thumbnail

Using DAS to Solve Capacity and Connectivity Challenges

Civil + Structural Engineer

“The days of people holding up their phones during a concert or a game to find cell service should be a thing of the past,” said Peter Tardy, PE, Director of Telecommunications at French & Parrello Associates (FPA), a full-service engineering and consulting firm based in Wall, NJ. It’s the same with having slow service.

article thumbnail

MODLOGIQ Installs North America’s Largest Modular Healthcare Site

CCR Magazine

” “We can’t wait for patients to experience the new facility and the care we provide, enabling them to stay closer to home,” says Memorial Health System President and CEO, Scott Cantley. That’s more than a year sooner than January 2026—an opening date a site-built approach would likely have offered.”

article thumbnail

Siemens opens Fort Worth manufacturing hub to support AI infrastructure boom

CCR Magazine

The 500,000 square foot facility has already introduced 480 new jobs and is on track to add a total of 800 roles by 2026. It addresses the pressing challenges of urbanization and climate change by connecting energy systems, buildings and industries.