article thumbnail

Achieving Best Value for Facility Renovation, Repair, Maintenance, and Construction – 2016 and Beyond

Building Information Management

Construction delivery methods define roles, responsibilities, deliverables, levels of risks, set the overall tone, and ultimately determine the success or failure of a project more so than any single element. Construction Delivery Methods. Integrated Project Delivery / Job Order Contracting.

article thumbnail

Job Order Contracting Information

Job Order Contracting

Public works contracts vary from private sector contracts in that legislation sets the contracting guidelines for contracts and the public interest demands safeguarding process integrity. Related Resources: ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

Integrating operating, design and construction knowledge through broad based team meetings. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management. should not be considered LEAN efficient construction delivery methods. Creating an open information environment.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The fundamental day-to-day business processes of the Engineering, Construction, Owner, and Operations sector are changing. That said, major cultural change must occur in order to make significant progress. The efficient life-cycle management of the built environment will not happen until change management is accelerated.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The fundamental day-to-day business processes of the Engineering, Construction, Owner, and Operations sector are changing. That said, major cultural change must occur in order to make significant progress. The efficient life-cycle management of the built environment will not happen until change management is accelerated.