Remove 2003 Remove Change Management Remove Structural Systems
article thumbnail

AISI Publishes “Thermal Design and Code Compliance Guide for C-Shape Cold-Formed Steel Framing in Building Envelopes”

Civil + Structural Engineer

F.ASCE, managing director of AISI’s Construction Technical Program. They will also be able to determine the level of performance in an energy code or high-performance rating system. In all cases, it is recommended that users refer to the adopted codes in effect where the building or structure will be constructed.”

article thumbnail

Stay code-compliant with AISI’s thermal design guide

Construction Specifier

This document is designed to meet a variety of user needs,” says Jay Larson, PE, F.ASCE, managing director of AISI’s construction technical program. They will also be able to determine the level of performance in an energy code or high-performance rating system.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Projects Fail

Job Order Contracting

Instead, most of the performance variations are caused by the system, of which those people are but a part. People can’t perform better than the system allows W. Edwards Deming – T he System of Profound Knowledge. First and foremost is important to understand that all projects are exercises in managing change.

article thumbnail

I am getting this error in Admin links categories DB function.

Construction Dive

Pet Experts. -- Dog Experts. -- Cat Experts. -- Bird Experts. -- Reptile Experts. -- Horse Management Experts. -- Dog Training Experts. Engineering Experts. -- Structural Engineering Experts. Enter Your Question. Subcategory. Select Your Expert.

article thumbnail

DoD FSRM, BUILDER SMS and the LEGACY of Wasteful Politics

Job Order Contracting

Zero credible cost visibility and inability to enable cost management… another instance of Government attempt to compete with the private sector and lack of capable and continuous accountable leadership. Modules are in development for utilities, fuels, water retention structures (e.g., dams and levees), and shorefront assets.

article thumbnail

Design is in the process: Early consultant collaboration drives better teams, designs, and buildings

Construction Specifier

On other days, one may find themselves in a creative flow, making significant progress, only to discover that the carefully developed unit plan or amenity space, previously vetted, now requires structural reevaluation. Mechanical ducts conflict with structural beams, soffits, or ceiling design. The best designs? The best approaches?

article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

billion square feet Total structures: 191,883 Total land acreage: 9.3 I first started working with public facilities and physical infrastructure capital planning and management decades ago. was crumbling under the weight of deferred maintenance and poor management. Little has changed over the subsequent decades.