Remove 2011 Remove Building Permits Remove Safety Regulations
article thumbnail

Civil Engineers: Maine’s Infrastructure Grade Improves to a ‘C’

CCR Magazine

The improving grades are the results of increased investment and efforts to build more resilient infrastructure. Now is the time to build on that progress by ensuring infrastructure funding remains a priority at all levels to ensure Maine has reliable infrastructure systems to power our states economy and improve everyones quality of life.

article thumbnail

Lessons From the Hudson River PCB Cleanup Project | ENR.

ENR Construction

Building Types. Safety & Health. The company had permits for most of its discharges. As those findings gained more substantiation, regulators issued fish-consumption advisories in 1971 for the river. Phase two started in 2011 and is expected to be completed by 2017 or 2018. Transportation. Environment.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Industry Focus: Food Processing – The Process Of Consistency

Business Facilities

In addition to worldwide passenger transport, Hancock has facilities for air freight transport including a 53,000-square-foot cargo building. Oswego County has Greenfield sites available that are ready to build on. Walking you through the permitting process. Developing incentive packages and sources of capital.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Preventative maintenance is critical to facilities occupant health and safety, as well as meeting an organization’s fiduciary responsibilities. Check Bollard/Barricade safeties (proximity, Photo, infra red, pressure etc) 7. Check operation of safety edges, stops, electric eye, treadle, or other operating devices.