Remove 2014 Remove Building Controls Remove Cost Control
article thumbnail

Precast Concrete Lintels: The Ultimate Guide to Strength, Durability & Installation

UK Construction Blog

Available in various types (standard prestressed, high strength and fair-faced options) and sizes (widths from 100mm to 215mm and lengths from 600mm to 3000mm), these lintels can accommodate diverse building requirements. What Are Precast Concrete Lintels?

article thumbnail

Where HS2 went wrong

The Construction Index

It sets out how the politicians in a hurry to build the world’s best and fastest railway meant that cost control went out of the window and gold plating ran riot. The delivery of the HS2 programme has been dominated and driven by the desire to build the best. In my view this has been evident on HS2.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Competition watchdog to probe road and rail construction

The Construction Index

The market study will examine whether there are opportunities to improve how the public sector and industry work together, for example through improvements to public procurement, so more cost-effective infrastructure can be built in support of the government’s growth mission.

article thumbnail

Management restructure at Reds10

The Construction Index

Thrive-AI applies machine learning to help clients operate their buildings more efficiently, improve user experience, reduce energy consumption and optimise the lifespan of critical assets. It’s a great business and gives Thrive-AI and Reds10 the opportunity to transform the use and operation of buildings for our customers.”

article thumbnail

Berkeley chief to become executive chair

The Construction Index

Perrins said that the supply chain was soaking up most of the pain when it comes to rising costs. For Berkeley, build costs have remained stable over the course of the year,” he said. “The This represents an excellent operational performance with highly disciplined execution and close control of costs.

article thumbnail

Another loss-making year for Keltbray

The Construction Index

regulatory cost relating to the settlement of a claim and associated legal costs. The turnaround was attributed to “increased rigor in opportunity selection, stronger project controls and tighter operational execution”. for last year. In the past five financial years Keltbray has only made a profit once. Got a story?

article thumbnail

Foreign speculators soften Barratt Redrow sales

The Construction Index

We are already seeing tangible benefits from the Redrow acquisition, with cost synergies being delivered ahead of schedule, a new divisional structure in place and revenue synergies progressing well. Barratt clearly has strong fundamentals in place, but like the rest of the sector, it is constrained by forces beyond its control.