Remove 2021 Remove Building Permits Remove Building Resilience
article thumbnail

NAHB Advocacy Efforts and Outcomes

The Pro Builder

and providing greater flexibility when using bond financing to build or preserve LIHTC properties. Promoting Resilient Buildings Act In a positive development on the codes front, the House has passed the Promoting Resilient Buildings Act of 2023. Impact Fees In a separate Supreme Court case, Sheetz v.

article thumbnail

Civil Engineers: Maine’s Infrastructure Grade Improves to a ‘C’

CCR Magazine

Thats a one-step increase from the 2020 Report Card for Maines Infrastructure and one step higher than the national average on the 2021 Report Card for Americas Infrastructure. The improving grades are the results of increased investment and efforts to build more resilient infrastructure. President of the Maine section of ASCE.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

2023 Yearbook of Engineering Achievement: Environmental/Sustainability

Civil + Structural Engineer

Additionally, retrofitting the pond to provide higher quality water treatment helps the county comply with the municipal separate storm sewer system permit and contributes to restoring the Chesapeake Bay.

article thumbnail

Natural Grocers Reno, NV

The MCP Group

Bid Due Date | June 4, 2024 10:00 AM Project Description MCP Build Nevada License #0087202 The project consists of a 16,533 sf renovation to the existing building. 2021 Addenda None at this time.

article thumbnail

Rossville Family Dental

The MCP Group

Bid Due Date | November 2, 2023 2:00 PM Project Description The project consists of a 5,608 sf renovation to the existing building with associated sitework. The building will be open from 10:00 AM to 2:00 PM on October 25 for site visitations. 2021 Addenda None at this time. 2021 Addenda None at this time.

article thumbnail

Natural Grocers Highlands Ranch, CO

The MCP Group

Bid Due Date | February 22, 2024 10:00 AM Project Description The project consists of a 23,740 sf renovation to the existing building. 2021 Addenda None at this time. The post Natural Grocers Highlands Ranch, CO appeared first on MCP GROUP.

article thumbnail

Caliber Collision Billings, MT

The MCP Group

Bid Due Date | March 19, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. 2021 Addenda None at this time. 2021 Addenda None at this time. We are to include erection.