Remove 2021 Remove Building Resilience Remove Plumbing
article thumbnail

ICC codes updated with the most significant changes in quarter-century

Construction Specifier

The International Code Council’s ( ICC ’s) 2024 plumbing and mechanical codes have the most significant changes in 25 years. The 2024 IPC improves public health through enhanced waste management requirements and plumbing system resilience to natural hazards. Photo courtesy International Code Council.

article thumbnail

Natural Grocers Reno, NV

The MCP Group

Bid Due Date | June 4, 2024 10:00 AM Project Description MCP Build Nevada License #0087202 The project consists of a 16,533 sf renovation to the existing building. 2021 Addenda None at this time.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

Trembly White Readiness Center Improvements

The MCP Group

Bid Due Date | September 10, 2024 2:00 PM Project Description The project consists of an elevator and vestibule additions and renovation to the existing building. 2021 Addenda ADD 1 The post Trembly White Readiness Center Improvements appeared first on MCP GROUP.

article thumbnail

Capitol Federal 29th & Kansas

The MCP Group

Bid Due Date | June 1, 2023 2:00 PM Project Description The project consists of an interior 1,945 sf renovation to the existing building. 2021 Addenda 01 – Addendum No. Please refer to Addendum #1 for the most current set of plans. Location Topeka, Kansas Plans 15 ST_Interior Remodel_100% Construction Documents 04.20.23

article thumbnail

Natural Grocers Highlands Ranch, CO

The MCP Group

Bid Due Date | February 22, 2024 10:00 AM Project Description The project consists of a 23,740 sf renovation to the existing building. 2021 Addenda None at this time.

article thumbnail

KDOT Blaine Subarea Modernization & Storage Building

The MCP Group

Bid Due Date | January 25, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space, and a new 5,925 sf pre- engineered wood building (pole barn). 2021 Addenda None at this time. 2021 Addenda None at this time.