Remove 2024 Remove Masonry Remove Plumbing Systems
article thumbnail

Deep energy retrofits: The future of sustainable buildings

Construction Specifier

Local Law 97 , which applies to buildings more than 2,322 m 2 (25,000 sf) in New York City, imposes penalties for structures exceeding emissions limits or failing to comply with reporting requirements beginning in 2024. Air leakage alone is responsible for six percent of the energy used by commercial buildings in the U.S.

article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. This esteemed honor results from the county’s recent restoration of its 1898 Courthouse, a project steeped in history.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Liberal High School Library Renovation

The MCP Group

Bid Due Date | May 14, 2024 10:00 AM Project Description The project consists of a 5,686 sf remodel to the existing library. 2021 Addenda None at this time.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KHRC Office Remodel

The MCP Group

Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. 2021 Addenda None at this time.

article thumbnail

KDOT Blaine Subarea Modernization & Storage Building

The MCP Group

Bid Due Date | January 25, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space, and a new 5,925 sf pre- engineered wood building (pole barn). 2021 Addenda None at this time.

article thumbnail

KDOT Beloit Subarea Modernization

The MCP Group

Bid Due Date | February 8, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space. 2021 Addenda None at this time.