Remove 2026 Remove Flooring Systems Remove Steel Fabrication
article thumbnail

The Los Angeles County Museum of Art: Enormous Complexity Under a Veil of Simplicity

ENR Construction

These four buildings were taken down, but there wasn’t enough site area to get all the floor area on this portion. acre site, the museum features a single level exhibition floor that presents all art on the same level with no hierarchy. “I SOM joined in 2015. Had we waited, the project would today be 20-30% more expensive,” Vesga says.

article thumbnail

Read About the Latest News on Construction Cost Stabilize, Submarine Construction Facility in Mobile, and US Army Engineers

Construction Daily News

Over the past 30 days, concrete, gypsum products, and hot rolled steel bars had minor price cuts, according to Associated General Contractors of America senior research analyst Macrina Wilkins. affiliate of Australian shipbuilder Austal, received the contract to build a submarine modular fabrication and outfitting plant in Mobile.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MODLOGIQ Installs North America’s Largest Modular Healthcare Site

CCR Magazine

MODLOGIQ , the leader in SMART OFF-SITE CONSTRUCTION, has begun transport and installation of the more than 200 modules that comprise the Athens Medical Campus—less than 12 months after fabrication began. That’s more than a year sooner than January 2026—an opening date a site-built approach would likely have offered.”

article thumbnail

Hear about the latest news on US construction OEMs record Yellow Table revenue, Sentinel missile infrastructure installation, OSU-led oceanographic research vessel construction, and FAA chooses greener airport control towers.

Construction Daily News

Malmstrom AFB, Montana, will commence project activities in 2026, and Minot AFB, North Dakota, in 2029. “So These are very technically advanced vessels and getting the many systems that scientists use to fit within the available internal space has been challenging,” said Demian Bailey, OSU’s lead investigator and RCRV program manager.