Remove 2026 Remove Ramps Remove Steel Fabrication
article thumbnail

Yellowstone River Bridge Sits Tall at Top of Canyon to Improve Safety, Access and Views

ENR Construction

Rising 180 ft above the river gorge, the four-span steel plate girder bridge will replace the existing structure, which was built in 1961 and is located just 700 ft to the southeast. The 65 steel girders, some up to 15 ft tall and 100 ft long, were fabricated by Utah Pacific in Lindon, Utah. Photo courtesy NPS/Jacob W.

article thumbnail

Read About the Latest News on Construction Cost Stabilize, Submarine Construction Facility in Mobile, and US Army Engineers

Construction Daily News

Over the past 30 days, concrete, gypsum products, and hot rolled steel bars had minor price cuts, according to Associated General Contractors of America senior research analyst Macrina Wilkins. affiliate of Australian shipbuilder Austal, received the contract to build a submarine modular fabrication and outfitting plant in Mobile.