Remove Approvals Remove Closeout Remove Permits
article thumbnail

Job Order Contracting Best Management Practices – Contractor Evaluation

Job Order Contracting

Did the Contractor adhere to the approved construction schedule? Did Contractor comply with all permits? Did Contractor submit complete closeout package in a timely manner? Did the Contractor make proposal/work order revisions as directed and resubmit on time? Was project/work order properly supervised?

Contracts 104
article thumbnail

The Ultimate Guide to Construction Site Inspection Checklist

Buildern

Once they approve that a particular phase of the project is complete, the lender provides the next installment of the loan. Inspectors should always check the blueprints and drawings, permits and licenses, project milestones and schedules and review the projects scope.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revolutionizing Construction with iFieldSmart Technologies: The Power of Construction Document Management Software

iField Smart

The use of Construction Document Management Modern construction projects include large data sets, which spans from architectural and structural drawings to permits, change orders, and contract documents. Greater cost savings and efficiency: Automation lowers the time spent on sharing, filing, and approving documents.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

The quality assurance and closeout/warranty submittals are evidence the specified pressure-impregnated FRTW meets the quality assurance requirements and warranty provisions in the following sections. Field cutting across the grain (cut-to-length) is permitted after treatment without field treatment of cut ends. Quality assurance.

article thumbnail

8 Must-Haves for a Construction Management Platform

In Eight

This complete life-cycle view of your project will eliminate rework and keep teams communicating across disciplines by utilizing a common dataset, from bid pursuit to project closeout and handover. Finding the right balance of out-of-the-box functionality plus customization and configuration to meet your needs is a must-have.

article thumbnail

Construction Budgeting 101

Autodesk Construction Cloud

securing permits, drawing up paperwork, etc.). Closeout: Once the building is complete, the project enters the closeout stage. Change orders take place when the owner or contractor implements modifications to the project after the models and budgets have already been approved. Common construction cost overruns.

article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

Review drawings and designs one final time At the start of the meeting, all drawings and designs should exist in a state of approval. The stark realities of complex coordination, inspection timelines, and closeout seem mercifully far away. However, if there’s a problem, you want to catch it up front.