Remove Article Remove Closeout Remove Fire Protection Systems
article thumbnail

Construction Project Closeout

cnstrctr

We’ve all been there, stuck on that job that everyone has left, construction project closeout is not fun, but it’s a necessary evil of every project. Quality and Issue Closeout. Financial Closeout. Focusing on these areas won’t necessarily guarantee a successful closeout but will put you on the right track.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

is experiencing a “wood revival” contributing to the complexity of fire-retardant-treated wood (FRTW) specifications. The building and fire codes require FRTW to be impregnated with chemicals. Interior FRTW is used in weather-protected applications ( i.e. where the FRTW is not permanently exposed to the elements).

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Benefits of Construction Mobile Apps

Construction Marketing

It takes an average of 18 minutes to find a paper document, and a whopping 70 percent of businesses would fail in three weeks if they had a catastrophic loss of paper due to a fire or flood. Mobile provides additional information to protect and validate inspections that paper form cannot. Checklists.

article thumbnail

Public Law 111-308 – Federal Buildings Personnel Training Act – FBPTA – CORE COMPETENCIES

Building Information Management

Leg islative Intent: Taxpaye r investment in Federal facilities must be protected and leveraged through the cost savings involved in maximizing building performance. Reviewers admired the system’s three levels of increasing knowledge, skills and abilities as a “concept”, but did not believe it was implementable government-­?wide.