Remove Books Remove Cost Control Remove Integrated Project Delivery (IPD)
article thumbnail

Role of Pre-Construction in Success

Job Order Contracting

The Critical Role of Pre-Construction in Success Pre-construction is the phase of a project where the greatest influence on cost, schedule, and quality outcomes can be achieved. The following foundational elements enable consistent, high-quality project execution—on time and within budget: 1.

article thumbnail

Master Builder Concept, LEAN, and Job Order Contracting

Job Order Contracting

Lean construction aims to embody the benefits of the Master Builder concept, as does Advanced Job Order Contracting, Integrated Project Delivery, and Alliance Partnering. This role encompasses all aspects of planning, architecture, engineering, and building, integrating both creative and technical responsibilities.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Planning Major and Minor Facilities / Asset Repair, Refurbishment, Maintenance, Renovation, and Construction

Job Order Contracting

How real property owners and facilities management professionals traditionally plan, procure, and deliver projects is the most significant barrier to improving capital reinvestment performance outcomes. In fact, less than 20% of all projects are delivered on-time and on-budget, or per stakeholder requirements.

article thumbnail

Alliance Contracting Key Aspects

Job Order Contracting

While alliance contracting is typically a term applied in the Australia and the UK to a model applied to large complex projects, its core aspects have been in place for both Integrated Project Delivery (IPD) for major projects, and LEAN, Open Job Order Contracting for years, if not decades.

article thumbnail

Unlock Public Sector Construction Productivity – A White Paper

Job Order Contracting

Two of these solutions are Integrated Project Delivery (IPD) and Job Order Contracting (JOC). Both IPD and JOC are not the issue, but rather the implementing organization and/or service provider have been the cause of “failure” Let’s focus on JOC. Long-term Mutually Beneficial Relationships.

article thumbnail

A Robust Framework for Improving Construction Productivity

Job Order Contracting

Integrating People, Process, Information, and Technology with a framework that combines and standardizes Planning, Procurement, and Project Delivery maximizes early and ongoing communication and enables consistent best value outcomes for ALL participants and stakeholders. Integrated Project Delivery: A Guide (1st ed.).

article thumbnail

Facilities Repair, Renovation, and Construction Cost Control

Job Order Contracting

Construction Cost Control Speed Procurement, Limit Waste, Mitigate Risk. Capital costs associated with repairing, renovating, and constructing buildings and other forms of physical infrastructure are out of control for many, if not most real property owners. Costs vary widely by location and remain hard to predict.