Remove Building Codes Remove Fire Protection Systems Remove Painting/finishing
article thumbnail

Timber Framing Design: Complete Guide to Traditional Structural Planning

UK Construction Blog

This comprehensive design process separates timber frame construction from conventional building methods and determines the success of the entire project. Timber framing design is the architectural and structural planning process for creating buildings using heavy timber construction with traditional joinery methods.

article thumbnail

Precast Concrete Lintels: The Ultimate Guide to Strength, Durability & Installation

UK Construction Blog

Available in various types (standard prestressed, high strength and fair-faced options) and sizes (widths from 100mm to 215mm and lengths from 600mm to 3000mm), these lintels can accommodate diverse building requirements. Each type offers unique characteristics suited to specific applications in masonry support systems.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The three Ps of prefabricated EIFS: Preparation, production, placement

Construction Specifier

Babaian Photos and illustrations courtesy Simpson Gumpertz & Heger (SGH) In its most general form, exterior insulation and finish systems (EIFS) consist of expanded polystyrene (EPS) insulation board coated with a reinforced polymer-modified cementitious base coat and a polymer-based finish coat.

article thumbnail

Transparent fire-rated design: Where safety meets student experience in campuses

Construction Specifier

Photos courtesy Technical Glass Products (TGP) When designing educational spaces, project teams must meet code-driven requirements such as accessibility and fire safety. Minimal colorless spaces in these butt-glazed, fire-rated assemblies provide a cohesive design aesthetic with the stairwell’s glass railings.

article thumbnail

How to Choose Trusted Tiny Home Builders in Queensland: Expert Guide 2025

UK Construction Blog

A professional tiny home builder will finish your project in eight to ten weeks. The building journey goes beyond just construction schedules. Experience and track record Professional tiny home builders know specialised construction methods that go beyond regular home building. Custom designs might take up to six months.

article thumbnail

Fenestration and glazing: Seismic performance specification considerations

Construction Specifier

By Amy Becker Photo courtesy Fenestration and Glazing Industry Alliance (FGIA) Specifiers and design professionals should always consider seismic performance attributes for buildings in areas that previously have experienced the damaging effects of earthquakes. Building codes are adopted with the intent to preserve life and safety.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The post Top 10 Construction Defects: Prevent These Costly Building Mistakes appeared first on UK Construction Blog. The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years.