Remove Building Commissioning Remove Environmental Consulting Remove Fire Protection System Installation
article thumbnail

The three Ps of prefabricated EIFS: Preparation, production, placement

Construction Specifier

Babaian Photos and illustrations courtesy Simpson Gumpertz & Heger (SGH) In its most general form, exterior insulation and finish systems (EIFS) consist of expanded polystyrene (EPS) insulation board coated with a reinforced polymer-modified cementitious base coat and a polymer-based finish coat. By Alex Ardelean, Elizabeth V.

article thumbnail

Curtain wall design-assist: Navigating the process for success

Construction Specifier

Curtain wall systems are ever present in today’s commercial construction marketplace. Design-assist is a popular procurement method for curtain wall systems in today’s commercial market, intended to help resolve these challenges, particularly for custom curtain walls with unique performance requirements and/or unique material configurations.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ENR West Industry News | June 2025: Fast-Tracked LA High School Completed in Four Weeks

ENR Construction

A new air-conditioning system was installed, and fire alarm and fire suppression systems were extended to meet code requirements. Driver was able to speed up the project timeline due to a close collaboration between the city of Santa Monica, the Santa Monica Fire Dept. and design firm Gensler.

article thumbnail

$80.5M Queens Borough Hall Garage: NYC’s First Design-Build

CCR Magazine

The Queens Borough Hall Municipal Garage and Community Space won the Design-Build Institute of America’s 2024 National Award of Merit. The garage is New York City’s first ever municipal project contracted as a design-build construction undertaking, under the recently authorized NYC design-build legislation.

article thumbnail

Understanding NFPA 110 Chapter 7: Tips for installing a compliant emergency power system

CK Power

National Fire Protection Association standard 110 —the standard for emergency and standby power systems— outlines requirements for the installation and performance of backup power systems in emergency and legally required applications, where an outage would pose a life safety risk.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use. Consult the Material Safety Data Sheets (MSDS) for hazardous ingredients and proper personal protective equipment (PPE). Special Instructions: 1. Lubricants.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 31 24 Environmental Assessment Information. Environmental Impact Study Report.