Moving from Design-Build, DB, to Integrated Project Delivery, IPD

Building Information Management

Providing the opportunity for the kind of collaboration that the construction industry so badly needs… Design-Build has a spectrum, ranging from almost as dysfunctional … all the way to almost as collaborative as Integrated Project Delivery. Shifting Design-Build toward IPD.

article thumbnail

BIM ( Building Information Modeling ), Cloud-computing, Changement Management, and Architecture, Engineering, and Construction – III

Building Information Management

Information drives cost savings and higher efficiency. How and when we access information will forever alter day-to-day and strategic business practices for Owners, AEs, Contractors, SubContractors, Business Product Manufacturers, Building Users, Oversight Groups, and the Community. Building Information Modeling Framework.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM and Cloud Computing – Get Beyond 3D Visualization and Focus Upon the “I”

Building Information Management

BIM and the Cloud – SAME 2012 – 4Clicks Solutions LLC – PDF. BIM - CLOUD COMPUTING. . BIM (Building Information Technology) and THE CLOUD (Cloud Computing) are disruptive technologies converging to significantly alter traditional construction and facility management practices.

article thumbnail

Construction Cost Knowledge Management

Job Order Contracting

Construction cost knowledge management is a component of integrated LEAN construction planning, procurement, and project delivery. It is required in order to consistently achieve best value repair, renovation, maintenance, and new build outcomes. has proven relatively fruitless.

article thumbnail

Integrated project delivery method

Job Order Contracting

An integrated project delivery method is arguably required in order to achieve desired quality, satisfaction, timing, and cost for over 90% of renovation, repair, or new construction projects executed. Integrated project delivery method. An Example… CDE and LEAN JOC Construction Delivery.

article thumbnail

Collaborative Construction Contracts Drive BIM, not Technology

Job Order Contracting

Collaborative Construction Contracts Drive BIM, not Technology. BIM, the life-cycle management of the built environment supported by digital technologies, holds promise, yet remains elusive to many. and a shared set of goals, as well as risk/reward among project participants. Understanding BIM. Introduction.

article thumbnail

6 Industry Hacks to Overcome Productivity Pitfalls

Autodesk Construction Cloud

Because cost is much easier to track, cost data is more generally available than time data, and it thus generates a more accurate metric than say, labour hours. While collaborative approaches are implemented with good intentions, the follow-through is often cut short due to a reluctance to comply with a project’s contractual terms.