Remove Building Performance Measurement Remove Document Remove Fire Protection System Installation
article thumbnail

Refine versus shine: Defining and defending design intent with refined concrete

Construction Specifier

LEED AP, Vivian Volz, CSI, AIA, LEED AP, SCIP Photo courtesy Tao Group Solutions After years of grappling with client callbacks, legal disputes, and financial losses from poor polished concrete installations, the industry has reached a breaking point: prohibit polished concrete.

article thumbnail

Your Business Safety Net: Why Regular Fire Sprinkler Checks Matter

UK Construction Blog

The post Your Business Safety Net: Why Regular Fire Sprinkler Checks Matter appeared first on UK Construction Blog. Fire sprinkler systems are one of the most critical safety features in any commercial building. But installing them isnt enough. But what about the silent heroessprinkler systems?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Precast Concrete Lintels: The Ultimate Guide to Strength, Durability & Installation

UK Construction Blog

The post Precast Concrete Lintels: The Ultimate Guide to Strength, Durability & Installation appeared first on UK Construction Blog. Installation requires precise techniques including a minimum 150mm end bearing on each side, proper alignment for cavity walls, and temporary supports for longer spans to ensure structural integrity.

article thumbnail

5 Uses for Thermal Imaging Equipment on Construction Sites

CCR Magazine

Assess building envelope performance: Check the integrity of the entire structure’s thermal performance. Validate newly installed systems: Ensure new installations deliver their promised thermal protection. Taking proactive measures prevents accidents and property damage.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The post Top 10 Construction Defects: Prevent These Costly Building Mistakes appeared first on UK Construction Blog. The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years.

article thumbnail

The three Ps of prefabricated EIFS: Preparation, production, placement

Construction Specifier

Babaian Photos and illustrations courtesy Simpson Gumpertz & Heger (SGH) In its most general form, exterior insulation and finish systems (EIFS) consist of expanded polystyrene (EPS) insulation board coated with a reinforced polymer-modified cementitious base coat and a polymer-based finish coat. By Alex Ardelean, Elizabeth V.

article thumbnail

Fenestration and glazing: Seismic performance specification considerations

Construction Specifier

By Amy Becker Photo courtesy Fenestration and Glazing Industry Alliance (FGIA) Specifiers and design professionals should always consider seismic performance attributes for buildings in areas that previously have experienced the damaging effects of earthquakes. Building codes are adopted with the intent to preserve life and safety.