Remove Ceiling Systems Remove Roofing Systems Remove Site Planning
article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Construction defects typically stem from poor workmanship, substandard materials, improper site preparation, or inadequate maintenance.

article thumbnail

PREMIER Design + Build breaks ground on NY Logistics Center

CCR Magazine

The 146,075-square-foot logistics center will feature 36-foot ceiling heights, 54-foot by 60-foot column spacing, 31 docks, two drive-in doors, and a 3,000-square-foot office space. acre site will include 16 parking spaces for tractor-trailers and 83 car parking spaces. The team plans to complete the project in Q4 2025.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why Preplanned LED Lighting Layouts Matter for Construction

CCR Magazine

Pre-planned worksite LED lighting layouts present cost-saving opportunities and mitigate redundant workload while safeguarding construction workers and passersby. Sports Field Construction Project Benefits: Facility managers and project managers benefit from significant cost savings when an adaptive outdoor lighting plan is utilized.

article thumbnail

Renovate or Extend? How to Choose the Right Home Improvement for Your Budget & Needs

UK Construction Blog

This ranges from creating open-plan living areas by removing walls to converting underutilised spaces like lofts into functional rooms. Open-Plan Reconfigurations : Creating open-plan living areas by removing internal walls costs approximately 2,000-4,000, not including any additional kitchen or flooring updates.

article thumbnail

Coordination Is Pivotal to ASU West Tempe Projects

ENR Construction

A massive vault located in its basement will house a thermal storage system being built out by Willmeng that will connect to the TDUP. Photo by Scott Blair/ENR To the south of the entry plaza sits the reception desk and a large, open dining hall with 20-ft-high ceilings. There’s not a lot of room to breathe,” Pizzolato says.

article thumbnail

FHSU Stroup Hall Addition and Renovation

The MCP Group

Bid Due Date | May 29, 2025 2:00 PM Project Description The project consists of a 30,856 sf 2-story addition with renovations and associated sitework.

article thumbnail

A Sculpted Cob House in Kazakhstan

Natural Building

Durable enough to last centuries, they can be quick to build: the initial plan was for this home to be constructed over three months. When the couple began the project in 2012, they were living in another log-cabin-style house they had previously built on the same site.