Remove Contracts Remove Magazine Remove Renewable Energy Systems
article thumbnail

Major works complete, terminal unveiled at Western Sydney International Airport

Roads Online

With major construction works now finished the focus will now shift to system testing and preparing the site for passengers and freight. The fit-out of the terminal’s retail precinct and airline lounges will take place closer to the airport’s opening as commercial tenders and final contracts continue to progress over the months ahead.

article thumbnail

First drive through complete for West Gate Tunnel

Roads Online

Related stories: Public feedback driving SRL East Design contract awarded for $200M Sydney road upgrade Construction begins on major renewable energy infrastructure Premier Jacinta Allan and Minister for Transport Infrastructure Danny Pearson drove the entire length of the four-kilometre outbound tunnel for the first time.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Contract awarded for 219 megawatt battery construction

Roads Online

CIMIC Group’s UGL has been selected for the design and construction of the Collie Battery and associated energy infrastructure in Western Australia. The Collie Battery is a 219MW/877MWh battery energy storage system (BESS) to be stored in the Western Australian town of Collie.

article thumbnail

$1B worth of contracts awarded for WA big batteries

Roads Online

The Western Australian Government has awarded more than $1 billion in contracts for works on battery storage systems in Kwinana and Collie. The new battery energy storage systems in Kwinana and Collie are set to provide cleaner, reliable and affordable energy for Western Australia.

article thumbnail

Koorangie Energy Storage Facility receives battery delivery

Roads Online

The Koorangie Energy Storage System in Victoria is one step closer to completion, following the delivery of 100 Tesla Megapacks. Once completed in 2025, the west Kerang facility will provide critical energy storage and boost the number of renewables that can be hosted in the Murray River region by up to 300 megawatts.

article thumbnail

UGL wins second stage works on the Western Downs Battery

Roads Online

The contract, which is for renewable energy producers Neoen, consists of the installation of a 270 MW / 540 MWh Battery Energy Storage System and the high voltage infrastructure to connect it to the grid at Neoen’s Western Downs Green Power Hub.

article thumbnail

McConnell Dowell completes works on Port Kembla Energy Terminal

Roads Online

McConnell Dowell has completed its works on the Port Kembla Energy Terminal, with multidisciplinary works helping to bring the facility a step closer to completion in New South Wales. The project aims to assist in the converting of disused coal terminal to provide flexible energy supply. Image courtesy of McConnell Dowell.