Remove Electrical Systems Remove HVAC Systems Remove Wall Systems
article thumbnail

Barrier breakthroughs: Achieving airtightness in modern construction

Construction Specifier

Improving building enclosure performance While energy efficiency might initially suggest well-insulated walls and efficient HVAC systems, controlling air leakage can be just as critical. A continuous air barrier system also protects the building structure by reducing the risk of localized condensation or moisture accumulation.

article thumbnail

Duct Heaters Could Be The Answer!

UK Construction Blog

Whether integrated into a new HVAC system or used as a supplemental heat source, duct heaters offer several advantages that make them a practical choice for many commercial settings What Is a Duct Heater? It typically uses electric heating elements or, in some cases, hot water or steam from a central boiler.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Examples include improperly installed plumbing, electrical wiring errors, and poor finishes.

article thumbnail

Plumbing Challenges in High-Rise Construction: A Plumber’s View

CCR Magazine

However, behind the scenes, theres a network of intricate plumbing systems that keep everything running smoothly. These systems are designed to ensure consistent water pressure, regardless of the floor or the time of day. The vertical distance that pipes must travel also adds significant weight to the plumbing system.

article thumbnail

Gateway of opportunity: Vertical-stacking doors in modern spaces

Construction Specifier

The positive effects of this design include a sleeker appearance and a clear adjacent ceiling area for mechanical, electrical, and plumbing fixtures. Designers can use the fifth wall for elements of interest. For instance, some models feature an object detection system preventing the door from closing when an obstruction is detected.

article thumbnail

From History to Hospitality: The Transformation of a Minneapolis Landmark

STAHL

Every floor necessitated structural reinforcement and new penetrations for plumbing, HVAC, and electrical systems. Hidden behind the walls were outdated shafts, coal chutes, and fire damage residue—all of which had to be addressed. The elevator had to be lowered to the basement to comply with code.

article thumbnail

Why I Chose a Tiny Container Home Over a Tiny House (Real Costs Revealed)

UK Construction Blog

These include energy-saving windows and systems to save water. Modern container homes’ Heat Recovery Ventilation System keeps 85% of thermal energy. Insulation ran between AUD$764 to AUD$1,528, while interior walls and finishing added another AUD$4,586 to AUD$7,644. These homes also help save metal for future generations.