Remove Flooring Systems Remove Structural Systems Remove Wall Systems
article thumbnail

Renovated historic site gets structural and mechanical overhaul

Construction Specifier

Renovation work included significant reinforcement of the original structure, restoration of historic interior trim, and upgrading modern mechanical and fire safety systems through original masonry walls. Many of the original doors have been restored and fixed in place on unit walls and throughout hallways.

article thumbnail

PERI Delivers Formwork & Scaffolding Solutions for Boston’s Seaport Square

Civil + Structural Engineer

The 525,000-square foot, 17-story building features two floors of restaurant and retail space and 15 stories of office space, occupied by Amazon’s Boston Tech Hub. The new structure also includes two levels of below-grade parking and outdoor terraces. The early striking with the drophead system reduces on-site material requirements.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MBCEA Announces 2024 Building of the Year Winners

Civil + Structural Engineer

It includes a total of seven buildings erected together to create an all-in-one complex with a standing seam metal roof and insulated metal wall panels. was the metal building systems provider. was the metal building systems provider. Commercial – Award of Merit : Floors & Doors 2.0 Garanco, Inc.

article thumbnail

Styrofoam’s Promise for Hurricane-Proof Homes

The Pro Builder

Vero Building Systems , a building materials manufacturing company, has begun production of its lightweight structural concrete insulated panels (SCIP). The SCIP system is composed of three main materials: steel, concrete, and expanded polystyrene (or, styrofoam). But it doesn’t end there.

article thumbnail

A System that Takes Developers and Builders from Design to Completion

The Pro Builder

A System that Takes Developers and Builders from Design to Completion qpurcell Fri, 03/08/2024 - 11:41 When the team behind the design-build company Shibusa Systems researched the causes of the U.S. Reynolds, cofounder, president, and CEO, Shibusa Systems. The upshot? Fewer people can build many more homes per year.”

article thumbnail

Black Buffalo Hits Print on First Internationally Code Compliant 3D-Printed Home

The Pro Builder

The first of its kind in the world, the LoMa home utilizes technology that makes it the first International Code Council Evaluation Service (ICC-ES)-approved home to use load-bearing 3D-printed walls. “We The NEXCON Printer is a modular printing system that, upon set up, can print the walls of a 40-foot by 40-foot home in under 30 hours.

article thumbnail

Wates to finish Tolent’s Vaux job in Sunderland

Construction Enquirer

The structural frames, floor slabs, and external walls for the new apartment blocks have been assembled by light gauge steel framing specialist Sigmat, which recommenced work on site in May and is due to complete this element of the development next month.