Remove Heavy Lifting Transportation Remove Ramps Remove Schedule Management
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 01 20 List of Schedules.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 20 List of Schedules. 00 31 13 Preliminary Schedules. Preliminary Project Schedule. Preliminary Construction Schedule. 00 41 23 Bid Form – Construction Management (Single-Prime Contract). 00 41 26 Bid Form – Construction Management (Multiple-Prime Contract). 00 01 20 List of Schedules.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. This section does not address powered man-lifts, harnesses, self retracting fall limiters, shock absorbers, and other related fall protection equipment that falls into the above requirements. Schedule maintenance on these doors so that it does not interfere with loading dock operations.

article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

Guardrail installation also applies to stairs, runways, and ramps situated six feet above a lower level. Getting caught in a piece of machinery or caught between a piece of heavy equipment and the ground or a wall could result in the loss of life or limb. Heavy loads should be transported by carts, dollies, and lifting tables.

article thumbnail

Read the Latest New on a Robot on London Project Skanska, the Carlisle Library Reconstruction, the Rise of Brand Above Lead Generation in Construction Marketing, and UK’s Largest Electric HGV Charging Site at Tilbury by Fleete

UK Construction Blog

a robotic installation system for lifts produced by Schindler, at the 105 Victoria Street project, which is located in the middle of London. Additionally, building is underway at Tilbury for the United Kingdom’s largest electric heavy-duty vehicle charging site, which is being built by Fleete. million ($4.25