Remove Historic Preservation Remove Integrated Project Delivery (IPD) Remove Specialty Contracting
article thumbnail

BIM Glossary Terms and Definitions – NBIMS-US – 2013

Building Information Management

The benefits include centralized and visual communication, early exploration of options, sustainability, efficient design, integration of disciplines, site control, as built documentation, etc.–effectively The management of work processes and software tools to produce required project information. Construction Delivery Method.

article thumbnail

GSA, LEED, USGBC, and Politics

Building Information Management

According to the OMB, investments in efficiency over the last four years are expected to save $18 billion in energy costs over the life of the projects. Integral Group. Integrated Environmental Solutions LLC. Musson General Contracting. National Trust for Historic Preservation. Primary Integration.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

In short, project teams, including owners, better deliver structures according to their capabilities, requirements, timelines, and budgets. Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

In short, project teams, including owners, better deliver structures to according to their capabilities, requirements, timelines, and budgets. Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. Procurement Requirements and Contracting Requirements.