Remove Lifts Remove Magazine Remove Ramps
article thumbnail

Works begin on Ballarat Station accessibility upgrade

Roads Online

Plans to improve accessibility at Ballarat Station include installing a pedestrian overpass with a passenger lift and stairs to both platforms, a new ramp and stairs to the northern station entrance, lighting and tactile upgrades, and landscaping. Crews will also start relocating communications services in the project area.

Lifts 105
article thumbnail

M80 project uses electric piling rig

Roads Online

This successful trial has put into motion the procurement of more renewable equipment, such as an electric boom lift, telehandler and excavator to start work on site later this year. For more information, visit: bigbuild.vic.gov.au/ The post M80 project uses electric piling rig appeared first on Roads & Infrastructure Magazine.

Ramps 95
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Works start on last Inland Rail Beveridge to Albury Tranche Two project

Roads Online

Construction has commenced and is ramping up on the Benalla railway station and surrounding works in northeast Victoria, which will support the safe passage of double-stacked freight trains through the town. Image courtesy of Inland Rail.

Ramps 66
article thumbnail

Accessibility upgrades complete at Tuggerah Station

Roads Online

The upgrade includes a new boarding assistance zone, new lifts, a new footbridge and concourse, and improved accessible public toilets. Two new lifts at Tuggerah were opened in October 2024 as the two-year project progressed. This is the first upgrade at Tuggerah since ramps and a footbridge were added in 1988.

article thumbnail

Latest designs revealed for Inland Rail station precinct

Roads Online

Station modifications include a new accessible railway platform, an additional pedestrian underpass with lifts, ramps and stairs and an open forecourt area for community use.

Ramps 52
article thumbnail

Net build completed on West Gate Tunnel

Roads Online

In some precision lifting on site, it took four cranes and crews in elevated work platforms to install each arch and support. The post Net build completed on West Gate Tunnel appeared first on Roads & Infrastructure Magazine. For more information, visit: bigbuild.vic.gov.au

Ramps 85
article thumbnail

Benefits of Hiring Professional Movers for Local & Long-Distance

CCR Magazine

Reduced Physical Strain The physical demands of moving can be overwhelming, particularly when it comes to lifting and carrying heavy furniture or appliances. By leaving the heavy lifting to the experts, you can avoid unnecessary physical strain and potential medical expenses. </p>