Remove Prefabrication Remove Ramps Remove Renewable Energy Systems
article thumbnail

Local Connection Key to Realizing Robust Housing

ENR Construction

CMC prefabricated the rebar for the project at a facility in the Bay Area, then trucked it to the site for installation. Early on, we were talking about mechanical systems for the units. We had some of the trades on early, all the MEPs, the exterior facade was prefabricated in Woodland and Sundt self-performed the concrete.”

article thumbnail

Cal Poly Humboldt's Vision for Realizing Robust Housing

ENR Construction

CMC prefabricated the rebar for the project at a facility in the Bay Area, then trucked it to the site for installation. Early on, we were talking about mechanical systems for the units. We had some of the trades on early, all the MEPs, the exterior facade was prefabricated in Woodland and Sundt self-performed the concrete.”

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Deep energy retrofits: The future of sustainable buildings

Construction Specifier

As the global focus on sustainability and climate change intensifies, the United States is seeing a new trend in building restoration-deep energy retrofits. buildings account for nearly 50 percent of energy consumption and 35 percent of total energy-related emissions.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 53 23 Temporary Ramps. 04 42 26 Grid-System-Supported Stone Cladding.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 53 23 Temporary Ramps. 04 42 26 Grid-System-Supported Stone Cladding.