Remove Project Management Remove Stonework Remove Wall Systems
article thumbnail

Case Study: StoneWorks and The New American Home 2023

The Pro Builder

Case Study: StoneWorks and The New American Home 2023 kcichowicz Wed, 05/10/2023 - 12:09 Case Study Image AN EXTERIOR SHOW STOPPER Situated on a.5-acre The MSV used on the project was locally sourced and manufactured within 150 miles from the project site – greatly reducing emissions from long-haul transportation.

Stonework 130
article thumbnail

Explore the Building Products That Make This Year's New American Home Another Standout

The Pro Builder

The project contains a total of four bedrooms, four baths and a half-bath, a two-car garage, and a handsome casita that provides an additional bedroom and bathroom. Signature Kitchen Suite Wall Oven The Double Wall Oven With Steam-Combi from Signature Kitchen Suite * provides everything for sous vide cooking.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

It includes an owner’s bedroom on the opposite end of the rear elevation that fully embraces the valley, and walls of glass at the home’s entry and along the back of the house that showcase a through-view to the lights of Las Vegas and the mountain range beyond. Project specs: The New American Home 2024 Location: Ascaya , Henderson, Nev.

article thumbnail

3 Secrets to Successful Landmark-Status Building Construction Projects

Commercial Construction Blog

When I think back on the most interesting construction projects and challenges I’ve handled in my career as a national commercial contractor, without a doubt some of the most memorable have been in landmark-status buildings. Because these buildings are well-known and prominently located, making it all the more exciting to work in them.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.