Remove 2004 Remove Building Information Modeling (BIM) Remove Project Management
article thumbnail

Behind the Build: Interview with Mostafa Saber, BIM & Design Manager at Diamond Developers

Autodesk Construction Cloud

Diamond Developers , a subsidiary of SEE Holding are driving the digital agenda across the entire lifecycle of a construction project. I started my career as an architect in my home city, Cairo, Egypt in 2004. By 2007, I was introduced to BIM and started to prefer 3D modelling over 2D.

article thumbnail

Revit OpEd: BIM Coordinator for Civil 3D and Revit

Revit OpEd

BIM Coordinator for Civil 3D and Revit. You can read more information HERE. It allows a Civil 3D user to define the shared coordinate system to be passed on to a Revit project. The process described assumes that the person deciding where the building goes is using Civil 3D which in my experience is not necessarily accurate.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: RTCUSA - Cannon Contest - I Heart BIM

Revit OpEd

RTCUSA - Cannon Contest - I Heart BIM. The entries have to submit 100 words about why they love BIM. I Love BIM" awwww. Its a heart modeled in Revit. Builds and Updates. Blog Listing - BIM and Misc. Site Information. Comments: Comments are moderated to manage spamming. Copyright Information.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Thursday: Information Exchanges.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Thursday: Information Exchanges.

article thumbnail

Revit OpEd: Revit LT

Revit OpEd

It is the formal repackaging of the Autodesk Labs Project Spark. Sure, there were projects or design considerations that the missing features would prove frustrating but a single seat of full Revit would probably have covered it, collaboration with outside parties that is. Builds and Updates. Blog Listing - BIM and Misc.

article thumbnail

OMNICLASS vs. UNICLASS / UNICLASS2 – BIM Ontology

Building Information Management

It doesn’t serve the whole project timeline, as it doesn’t have homes for high-level (early-stage) objects such as Complexes, Activities and Elements. The Uniclass2 Work Results Table has homes for objects of all classes from Regions down to Products, so can fully serve the project timeline, and all procurement routes.