#146: Design-Build Contracts and the Spearin Doctrine: an Update
NH Construction Law
MAY 24, 2025
414, 428-29 (2007), “the implied warranty is that the specifications will result in a satisfactory, acceptable, or adequate result; short of that, the specifications are defective and the contractor is entitled to an equitable adjustment.” As described by AAB Joint Venture v. United States , 75 Fed.