article thumbnail

Light at the End of the Tunnel

Civil + Structural Engineer

The business started in 2008 when a group of experienced construction workers banded together to form a company that uses seasoned crews and innovative technologies. This project needed equipment that adhered to the tunnels shape, while increasing our productivity for the concrete finishing process, Clover said.

article thumbnail

#144:  What Is a “Material” Breach Justifying Contract Termination?

NH Construction Law

458, 465 (2008), the Court held that “the plaintiffs’ subjective satisfaction, or lack thereof, with Lebel’s work is legally irrelevant so long as any flaws in Lebel’s performance did not amount to a material breach; absent material breach by Lebel, the plaintiffs were contractually obligated to allow him to finish the job.”

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Closed-cell polyurethane: Insulate, seal, protect

Construction Specifier

This setup allows for the continuity of the exterior finish that extends both below and above ground. Following backfilling, a finishing layer can be applied to the cement board to achieve the desired aesthetic. Notes 1 Refer to Technical Bulletin 2, Flood Damage – Resistant Materials Requirements, FEMA, August 2008.

article thumbnail

Corpus Christi Mall Maintains Green Initiatives in Daily Operations

CCR Magazine

La Palmera has worked to improve the air quality for guests and employees with an Indoor Air Quality Management Plan that includes a smoke-free environment and the use of low volatile organic compounds (VOCs) and materials such as paints, adhesives, sealants, and carpets. Changs and H&M. established by the U.S.

article thumbnail

Future within grasp with Komatsu

Roads Online

From inventing the worlds first Autonomous Haulage System in 2008, developing an electric bulldozer capable of operating underwater, to conceptualising an excavator that can operate on the moon, Komatsu has long been a pioneer in construction machinery.

article thumbnail

Can California high-speed rail survive without federal funds?

Construction Dive

The OIG report also said it is “increasingly unlikely” the authority will be able to finish that segment by its target date of 2033. billion from 2008’s voter-approved bond measure and from California’s emissions cap-and-trade program. The FRA said in the letter it is “convinced CHSRA has no credible plan to address this funding gap.”

article thumbnail

U.S. hotel construction pipeline finishes 2019 trending upward

BD+C

These robust year-end counts are a mere 135 projects/76,649 rooms shy of the all-time high of 5,883 projects/785,547 rooms reached in the second quarter of 2008. The pipeline has now completed its eighth consecutive year of growth.