Remove 2010 Remove Flooring Systems Remove Painting/finishing
article thumbnail

AI fuels data center demand: Can precast concrete keep up?

Construction Specifier

Precast concrete is a desirable material for these buildings for a variety of reasons, whether used for walls, floors, and roof panels in a total precast structure or as an enclosure system. It may or may not have topping for the floor/roof. Illustrating the benefits of a total precast systems controlled access zone (CAZ).

article thumbnail

Revit OpEd: Finish and Cancel Inequity

Revit OpEd

Finish and Cancel Inequity. He mentioned the inconsistency between the way some elements that are sketch based are finished and the way shape editing for floors and roofs finish. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel. Floor, roof, stair or ramp Sketch Creation = Finish and Cancel.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Effects of acoustical ceiling panel type: Vertical sound isolation

Construction Specifier

Inter-room noise isolation applies to enclosed rooms horizontally adjacent to one another on the same floor. For example, students being energetic in their classroom on an upper floor of a school building should not disturb peers concentrating in the library below them. Requirements in building standards.

article thumbnail

How to Decrease Commercial Construction Costs by Reusing the Right Items

HardHatChat

When converting a grocery story into the new headquarters of Englewood Construction, many existing materials were reused, including this concrete floor, which received a face lift with a new stain. In the fall of 2010 we moved into our new, bigger, brighter and more energy efficient headquarters in downtown Lemont , Ill.,

article thumbnail

Revit OpEd: Happy Birthday Revit

Revit OpEd

Missing Foreword for Introducing Revit 2010. Wall Floor Interaction and Linked Models. Finish and Cancel Inequity. ► 2010. ► December 2010. (30). ► November 2010. (31). ► October 2010. (30). ► September 2010. (24). ► August 2010. (24). ► 2009.

article thumbnail

Cairo & the Built Environment: Past, Present, and Future

Civil + Structural Engineer

This ambitious project–owned by the Egyptian National Authority of Tunnels (NAT)–is intended to create a direct connection between Cairo, the New Administrative Capital, and 6th of October City via a two-line rapid transit system. When completed, this will be the longest driverless monorail system in the world.

article thumbnail

Revit OpEd: Layer Function Setting

Revit OpEd

System families have a Function setting. Thats true for Walls, Floor, Roofs and Ceilings. Finish 1 [4] = Finish Exterior [4]. Finish 2 [5] = Finish Interior [5]. Just a question, I also practice n°4 finish for exterior and n°5 for interior, but for the pure operation of Revit, is there a reason?