Remove 2017 Remove Cost Control Remove Estimating
article thumbnail

Construction Cost Analysis

Job Order Contracting

A reliable Construction Cost Analysis requires objectivity, currency, and detailed research of the local market. Objective comparsions of locally researched cost data and issues associated with national average cost data and location factoring are shown below. #1. Peitlock, B.A., Martinez, A., Martinez, A., 2013) #4.

article thumbnail

2023 Yearbook of Engineering Achievement: Water/Stormwater

Civil + Structural Engineer

Alpha Testing, a UES company, was chosen by the North Texas Municipal Water District (NTMWD) to provide quality control/construction materials testing services to multiple project teams. Bois d’Arc Lake will span 16,641 acres. The dam is two miles long and 90-feet tall, with a 110-foot-tall intake tower. Impact : The 9.5-acre

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Toll Brothers City Living® and Daiwa House Announce Joint Venture to Develop Waterfront High-Rise Condominium Community on New Jersey’s Gold Coast

Civil + Structural Engineer

These statements contain words such as “anticipate,” “estimate,” “expect,” “project,” “intend,” “plan,” “believe,” “may,” “can,” “could,” “might,” “should,” “likely,” “will,” and other words or phrases of similar meaning. dollar; market demand for our products, which is related to the strength of the various U.S. business segments and U.S.

article thumbnail

Why It’s Time for Contractors to Adopt Collaborative BIM

Viewpoint Construction Technology

The JBKnowledge 2017 Construction Technology Report , which covers topics such as software adoption and IT investment, reveals some interesting—and perhaps a little troubling—insights about BIM. The 2017 report found the industry hasn’t made much progress in this regard. in 2016 to 10.4

article thumbnail

DoD FSRM, BUILDER SMS and the LEGACY of Wasteful Politics

Job Order Contracting

Zero credible cost visibility and inability to enable cost management… another instance of Government attempt to compete with the private sector and lack of capable and continuous accountable leadership. DoD hasn’t achieved a clean audit since independent audits were initiated in 2017. Stokes, C, Pena, V.

article thumbnail

8 ways to cool a factory

BDC Network

8 ways to cool a factory 0 qpurcell Sat, 06/08/2024 - 10:00 Industrial Facilities Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace. The “human factor” comes in second place.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

The building’s strategic design includes a 35 percent targeted reduction in potable water use through efficient fixtures and equipment, a 25 percent targeted reduction in energy costs with a focus on thermal performance and optimal heating, and a 360-panel floating solar array to name a few. Bois d’Arc Lake will span 16,641 acres.