Remove 2024 Remove Flooring Systems Remove Roofing Systems
article thumbnail

AI fuels data center demand: Can precast concrete keep up?

Construction Specifier

Precast concrete is a desirable material for these buildings for a variety of reasons, whether used for walls, floors, and roof panels in a total precast structure or as an enclosure system. It may or may not have topping for the floor/roof. and the engineer of record for 50 to 80 data centers a year.

article thumbnail

The three Ps of prefabricated EIFS: Preparation, production, placement

Construction Specifier

Babaian Photos and illustrations courtesy Simpson Gumpertz & Heger (SGH) In its most general form, exterior insulation and finish systems (EIFS) consist of expanded polystyrene (EPS) insulation board coated with a reinforced polymer-modified cementitious base coat and a polymer-based finish coat. By Alex Ardelean, Elizabeth V.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Coordination Is Pivotal to ASU West Tempe Projects

ENR Construction

A massive vault located in its basement will house a thermal storage system being built out by Willmeng that will connect to the TDUP. A studio and classroom building borders the north end of the courtyard and houses a dance studio with a spring-loaded wood dance floor, a paper-making and binding lab, classrooms and a motion-capture theater.

article thumbnail

Morgan Sindall bags £37m Clydach Vale school contract

The Construction Index

Set across a two-storey building, the project includes the construction of 23 classroom spaces, a wellbeing centre, canteen, various multi-use spaces and supporting areas across the two floors, and a hydrotherapy pool on the ground floor. The entire school site will be enclosed by a secure boundary fencing. stake in Sizewell C.

article thumbnail

Morgan Sindall to build Bishop Auckland leisure centre

The Construction Index

The new Bishop Auckland leisure centre will have a 25-metre, six-lane main pool and a 20-metre four-lane teaching pool with moveable floors, as well as a large gym, two exercise studios and an adventure play area for children. The facility also incorporates a public library to cater for healthy minds as well as healthy bodies.

article thumbnail

Liquid vs Air: How Liquid Cooling Reduces AI Data Center Carbon Emissions

Stok

AI touches every corner of our lives—from streaming your favorite show, to suggesting that funny meme, to protecting your home via your security system. This usually leads to lower structural material requirements, notably concrete, steel, and MEP systems, the main sources of embodied carbon in a data center.

article thumbnail

Demolition firm fined after worker’s fall

The Construction Index

On 25 th May 2023, 42-year-old Sylwester Zdunczyk was working with a team on the warehouse roof, removing aluminium over-sheeting. The sheets were being carried to pre-cut holes in the roof from where they were dropped to the ground floor. He fell approximately six metres to the concrete floor below. the roof Got a story?