Remove 2024 Remove Roofing Systems Remove Wall Systems
article thumbnail

The three Ps of prefabricated EIFS: Preparation, production, placement

Construction Specifier

Babaian Photos and illustrations courtesy Simpson Gumpertz & Heger (SGH) In its most general form, exterior insulation and finish systems (EIFS) consist of expanded polystyrene (EPS) insulation board coated with a reinforced polymer-modified cementitious base coat and a polymer-based finish coat. By Alex Ardelean, Elizabeth V.

article thumbnail

AI fuels data center demand: Can precast concrete keep up?

Construction Specifier

Precast concrete is a desirable material for these buildings for a variety of reasons, whether used for walls, floors, and roof panels in a total precast structure or as an enclosure system. It may or may not have topping for the floor/roof. and the engineer of record for 50 to 80 data centers a year.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A winning foundation: Solid defense with low carbon concrete

Construction Specifier

These winning ways have now extended beyond the court as the teams new $64-million training facilitythe Seattle Storm Center for Basketball Performancewas named a winner in the National Ready Mixed Concrete Associations (NRMCA) 2024 Concrete Innovation Awards. Meeting the tight timeline Speed was also of the essence for this project.

article thumbnail

Coordination Is Pivotal to ASU West Tempe Projects

ENR Construction

A massive vault located in its basement will house a thermal storage system being built out by Willmeng that will connect to the TDUP. Models of the thermal energy storage (TES) system, left, and the Tempe District Utility Plant, right, show the complex system of piping and equipment.

article thumbnail

Deep energy retrofits: The future of sustainable buildings

Construction Specifier

Local Law 97 , which applies to buildings more than 2,322 m 2 (25,000 sf) in New York City, imposes penalties for structures exceeding emissions limits or failing to comply with reporting requirements beginning in 2024. Air leakage alone is responsible for six percent of the energy used by commercial buildings in the U.S.

article thumbnail

Big day for Big Carl

The Construction Index

With its 14-metre-tall dome now in place, the second 44-metre-high reactor building is now ready for the installation of the nuclear reactor and equipment.

article thumbnail

Speller Metcalfe in for Droitwich baths

The Construction Index

The installation of air source heat pumps , comprehensive upgrade works to heating and ventilation systems, plus the installation of solar panels mounted to the roof of the new extension, will all improve energy efficiency.