Remove 2025 Remove Carpentry Remove Painting/finishing
article thumbnail

Building world-class hotels: The power of preconstruction and self-perform services

Construction Dive

Five-Star Quality and Control: PCL’s Self-Perform Expertise Once construction begins, PCL’s ability to self-perform key scopes of work — such as concrete, carpentry and finishing — ensures greater control over quality, scheduling and workforce management. By Matthew Thibault • May 29, 2025 Keep up with the story.

article thumbnail

The Hidden Crisis in UK Homes: Poor Plastering Leading to Unnecessary Costs for Homeowners

UK Construction Blog

Cracked, crumbling, or poorly finished plaster is no longer just an eyesore; it signals deeper issues with building standards and ongoing maintenance. Paint and wallpaper may also fail to stick properly or become stained due to trapped moisture behind faulty plaster.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Reserves at Cobalt Cir. – Brownsville, TN

The MCP Group

Bid Due Date | June 12, 2025 2:00 PM Project Description This project features new construction of 3 24 -unit, 3-story Apartment Buildings with one attached clubhouse. ALL scopes of work are needed.

article thumbnail

Phase 2 Core and Shell, 2405 Patterson Road

The MCP Group

Bid Due Date | June 17, 2025 2:00 PM Project Description The project consists of a faade renovation for the Core & Shell project.

article thumbnail

The Residence at Veterans Park – Knoxville, IA

The MCP Group

Bid Due Date | February 27, 2025 2:00 PM Project Description This project features new construction of a 48-unit, 3-story Senior Living Apartment Building. ALL scopes of work are needed.

article thumbnail

Capitol Federal Nall Hills Interior Renovation

The MCP Group

Bid Due Date | April 17, 2025 2:00 PM Project Description The project consists of a phased interior renovation, a schedule will be released by addendum. Location Overland Park, Kansas Plans Capitol Federal_Nall Hills Interior Renovation_Bid Set_01 April 2025 Specifications On the plans.

article thumbnail

Core and Shell Specialty Retailer Walla Walla, WA

The MCP Group

Bid Due Date | April 17, 2025 2:00 PM Project Description The project consists of structure demolition, and selective demolition to the existing building, with build back and sitework.

Masonry 40