Remove Ceiling Systems Remove HVAC System Installation Remove Plumbing
article thumbnail

Plumbing Challenges in High-Rise Construction: A Plumber’s View

CCR Magazine

However, behind the scenes, theres a network of intricate plumbing systems that keep everything running smoothly. Plumbing in high-rise construction is far more complicated than in single-story homes or low-rise buildings. Plumbers often address this issue by installing booster pumps and pressure-regulating valves.

article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. Innovative Solutions Driving Sustainable Success The $8.1M

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Examples include improperly installed plumbing, electrical wiring errors, and poor finishes.

article thumbnail

Energy Efficiency and Sustainability Lessons From The New American Home 2023

The Pro Builder

The New American Home (TNAH) 2023 not only showcases stunning design and views of the Las Vegas Valley but also serves as a model of high performance in home design, from the home's natural resource efficiencies and renewable energy systems to the healthy, comfortable indoor environment it provides for its owners. air changes per hour.

article thumbnail

Why I Chose a Tiny Container Home Over a Tiny House (Real Costs Revealed)

UK Construction Blog

These include energy-saving windows and systems to save water. Modern container homes’ Heat Recovery Ventilation System keeps 85% of thermal energy. The ceiling height starts at 2.39m but drops to about 2.2m A high cube container gave me an extra foot of ceiling height compared to standard ones. to AUD$56.57

article thumbnail

Alexandria City HS Redevelopment Features Rockfon Ceilings

CCR Magazine

The architectural team specified Rockfon acoustic stone wool ceiling systems to support the new high schools multiple performance requirements and to create a modern appearance aligned with 21st century educational facilities. Rockfon ceiling panels also comply with all acoustic ceiling requirements for LEED v4.

article thumbnail

IFS renovates two historic buildings into mixed-use lofts

CCR Magazine

IFS provided design/build HVAC, fire protection and plumbing services as part of the $9.6 Image Courtesy of Advantes Group IFS also provided design/build HVAC, fire protection and plumbing services as part of the $14 million Greeley Lofts renovation. million renovation of the former Hoffman Produce Building on N.