Remove Concrete Pouring Remove Electrical Systems Remove Plumbing Systems
article thumbnail

2023 Yearbook of Engineering Achievement: Transportation & Infrastructure

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

article thumbnail

Profile – Drone Manager Nick Ross

Granger Construction

.” VDC Project Delivery Grangers visual capture services have played a key role in the successful delivery of some of the firm’s largest and most complex self-perform concrete projects. Nick utilized a drone with a 48-megapixel camera to collect data from the air and embedded location information into each image.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Yellowstone River Bridge Sits Tall at Top of Canyon to Improve Safety, Access and Views

ENR Construction

National Park system would come with its own unique set of challenges. In addition to its 180 ft height, the new bridge spans 1,285 ft with girders resting on three concrete piers. We had to have a liquid cooling system for the concrete and monitor the temperature to make sure it was curing properly.” —Jon

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete).

article thumbnail

Retail Construction: 3 Construction Cost-Savings Tips for De-malling a Shopping Mall

HardHatChat

Reusable elements should include: Steel and concrete – save as much of the physical shell as you can. The base structure – no need to pour a new foundation. Roof systems – depending on their age and how they work into the new plan. Concrete slabs – only cut as needed to accommodate tenants.

article thumbnail

The Start of Celebration: the 2023 Yearbook of Engineering Achievement

Civil + Structural Engineer

It features elements that maximize the safety, security, and efficiency of the travel process including 100 percent automated screening lanes, 100 percent facial recognition “e-gates” for international departure, an innovative landside terminal design, and 100 percent trackable RFID Independent Carrier System.

article thumbnail

Everything You Need to Know About Building Your Own Home

CCR Magazine

Consider factors such as size, style, layout, number of rooms, and special features like outdoor spaces, basements, or energy-saving systems. In addition to your contractor, you may need to work with an architect, an engineer, and subcontractors specializing in plumbing, electrical work, and HVAC systems.