Remove Concrete Pouring Remove Plumbing Systems Remove Waterproofing Systems
article thumbnail

Yellowstone River Bridge Sits Tall at Top of Canyon to Improve Safety, Access and Views

ENR Construction

National Park system would come with its own unique set of challenges. In addition to its 180 ft height, the new bridge spans 1,285 ft with girders resting on three concrete piers. We had to have a liquid cooling system for the concrete and monitor the temperature to make sure it was curing properly.” —Jon

article thumbnail

What Is Sunken Slab | Advantages & Disadvantages Sunken Slab

CivilJungle

The sunken slab is one of the familiar and adaptable ways to maintain architectural design in especially the washroom, as well as laundry areas where water drainage systems or pipes installed below the floor or tiles. This system is accepted to provide an easy way to install sanitary products and built eye-catching views in those areas.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete).

article thumbnail

Water Leakage from Ceiling | water leakage from ceiling | How to Stop Water Leakage from Ceiling

CivilJungle

Water can be the most destructive element for structures that are mainly constructed from concrete. The water leakage problems are due to various issues such as defective plumbing systems. If the faces of the walls are exposed to the rain and it is not properly protected and waterproofing is done. Roof Water Leakage.

article thumbnail

Polysulfide Sealant Vs Polyurethane Sealant | Functions of Sealants | What Is Polysulphide Sealant | What Is Polyurethane Sealant

CivilJungle

In building construction, the first stage is earth excavation , which is then followed by dewatering the trenches, laying of brick flat sloping and PCC layer, placing of reinforcement caging for the construction of footings, and finally the Concreting of foundations. Adhesive resins such as bitumen, tar, natural gum, wax etc.

article thumbnail

Tapered insulation systems: The art of roof drainage

Construction Specifier

1 The only exception noted in the code is for a coal tar based roof system. A sloped water-shedding roof can tolerate some minor imperfections during construction and still perform its primary function for waterproofing. The 2018 International Plumbing Code ( IPC ) Section 1101.7 Section 1105.2 Section 1106.1 1) through 1106.1(5)

article thumbnail

Tapered insulation systems: The art of roof drainage

Construction Specifier

1 The only exception noted in the code is for a coal tar based roof system. A sloped water-shedding roof can tolerate some minor imperfections during construction and still perform its primary function for waterproofing. The 2018 International Plumbing Code ( IPC ) Section 1101.7 Section 1105.2 Section 1106.1 1) through 1106.1(5)