article thumbnail

How to Create an Independent Government Cost Estimate

Job Order Contracting

What is an Independent Government Cost Estimate? An IGCE (also in construction related service an IGE) is a cost estimate developed by the Government Requiring Activity, based on the requirements of the Performance Work Statement (PWS) or Statement of Work (SOW). How was the estimate made? What assumptions were made?

article thumbnail

Construction Cost Estimating Factors

Job Order Contracting

Construction Cost Estimating Factors 2022 – Construction Cost Estimating Factors that determine validity, transparency, and level of cost management capability. An estimate is no better than its basis. An estimate is a prediction and carries uncertainty. An estimate is a decision-making tool. CORE PRINCIPLES.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

AtkinsRéalis Awarded $26M US Florida Department of Transportation Engineering Services Contract 

Civil + Structural Engineer

TSX: ATRL), a fully integrated professional services and project management company with offices around the world, has been awarded a contract to provide general engineering consulting (GEC) services for the Florida Department of Transportation (FDOT). Montreal  – AtkinsRéalis [SNC-Lavalin Group Inc.] (TSX: million roadway miles daily.

Contracts 259
article thumbnail

JOC Program Line-item Estimating

Job Order Contracting

NEVER accept a lump sum estimate for a workorder/project without a full detailed line-item estimate and review of line-times and quantities. Fully audit cost estimate and actual cost information. The UPB and its update frequency should be noted in the Job Order Contract. Verify all aspects of the direct work (e.g.,

article thumbnail

It’s a very good year for contractors to partner with government

Civil + Structural Engineer

This unique project, which includes the construction of a cryogenic facility that will house the world’s first industrial-use quantum computer, is estimated to cost $9 billion and is backed by a diverse group of supporters, including the state of Illinois, the U.S. The cumulative effort is estimated to cost $400 million.

article thumbnail

2020 Guide to Construction Cost Estimating

Job Order Contracting

2020 Guide to Construction Cost Estimating provides a road map for applying best management practices necessary to drive financial visibility and transparency. Since other levels or types of cost estimating can’t meet this level, care should be given as to what form of cost data is being use. General Conditions. Introduction.

article thumbnail

Line Item Construction Cost Estimating – 2020 and Beyond!

Job Order Contracting

Detailed line item construction cost estimating is a prerequisite to obtaining best value outcomes for facilities / built infrastructure repair, renovation maintenance, sustainability, and new construction projects. A locally researched detailed line item construction cost estimating database plays a key role in this regards.