Remove Facility Management Remove Quality Assurance Remove Quality Control
article thumbnail

The Role of As-Built Drawings in Quality Assurance and Quality Control

iField Smart

The Role of As-Built Drawings in Quality Assurance and Quality Control As-built drawings are accurate and exhaustive construction documents that portray the final state of construction. This leads to greater quality assurance and control for construction projects.

article thumbnail

When Speed Counts: EPCM Delivery for Industrial and Manufacturing Projects

Civil + Structural Engineer

For owners facing this scenario, integrated services like the Engineering, Procurement, and Construction Management (EPCM) delivery method may be the best option for your project. Summary of both stays at the defined level, and the contingencies are under Client control, not contractors.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Startup Turns Concrete into a Carbon Capture Solution

The Pro Builder

We don’t add a facility or process. Photo courtesy Carbon Limit Carbon Limit also performs quality assurance and control to quantify the project’s environmental impact, ensuring the materials capture CO2 as intended. They already know what they’re doing. We don’t want to re-create the wheel,” Sperry says. “A

article thumbnail

Anne Glubis Joins Legacy Engineering’s Executive Team as Director of Geotechnical Operations

Civil + Structural Engineer

Her specialties include soils, foundations, construction materials testing and inspections, quality assurance, and quality control management. About Legacy Engineering Founded in 2005 by Jacksonville native John E. Ellis, Legacy Engineering is the largest locally-owned testing firm in the region.

article thumbnail

AI fuels data center demand: Can precast concrete keep up?

Construction Specifier

By Tim Cullen and Tom Bagsarian Photos courtesy Encon United Much attention has turned to data center construction, not only in the United States, but throughout the world, as technology companies strive to find facilities to house the infrastructure needed as artificial intelligence (AI) becomes more prevalent. Section B: Active MEP work.

article thumbnail

PROVEN FORMULA FOR EFFICIENT FACILITIES Repair, Renovation, Maintenance, and New Construction

Job Order Contracting

PROVEN FORMULA FOR EFFICIENT FACILITIES Repair, Renovation, Maintenance, and New Construction. Robust Process Integration + Common Shared Cost/Technical Information + Supporting Tech = Measurably Improved Cost Management. Manage costs of all types: Effort (labor, crews, timelines), quantities, materials, and equipment.

article thumbnail

STV Celebrates the Successful Completion of Sound Transit’s Lynnwood Link Extension Project

Civil + Structural Engineer

SEATTLE, WA – STV, a leading professional services firm that plans, designs and manages infrastructure projects across North America, joins Sound Transit in celebrating the opening of the Lynnwood Link Extension , an 8.5-mile vice president and Pacific Northwest area manager at STV. “We