Remove Lifts Remove Prefabrication Remove Project Management
article thumbnail

The three Ps of prefabricated EIFS: Preparation, production, placement

Construction Specifier

EIFS-clad wall panels can be fully prefabricated, from the structural backup to the finish coat. As a result, EIFS has become an attractive cladding option for use in prefabricated wall panels, in which EIFS materials are shop-applied to sheathing and metal stud backup wall construction under controlled conditions.

article thumbnail

Light Steel Frame Systems: A Modern Solution for Sustainable Construction

UK Construction Blog

These systems are used in both residential and commercial projects due to their strength and flexibility. One of the most notable is their ability to be prefabricated, meaning components can be constructed off-site. Quick Assembly : Prefabrication helps reduce construction timelines. This leads to shorter build times on-site.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Profile – Drone Manager Nick Ross

Granger Construction

Since joining the construction industry in 2023 as Granger Construction’s Drone Manager, Nick Ross has significantly elevated the capabilities and contributions of the firm’s in-house Virtual Design and Construction (VDC) program. As luck would have it, he contracted to shoot aerial photography for one of Granger’s projects.

article thumbnail

A Perfect Storm of Challenges: State of the Concrete Industry

For Construction Pros

bubutu - stock.adobe.com Concrete contractors in 2025 are facing a perfect storm of challenges that are reshaping how work gets done on-site, impacting project timelines, budgets, and workforce stability. With an aging workforce and fewer younger workers entering the trade, contractors are stretched thin across projects.

article thumbnail

Local Connection Key to Realizing Robust Housing

ENR Construction

Poirier The 964-bed student housing project in Arcata, Calif., That was the most important directive for the project team on Cal Poly Humboldt’s $195-million student housing project when planning first began in 2022. After two years of construction, the project—Hinarr Hu Moulik East & West Student Housing at St.

article thumbnail

Cal Poly Humboldt's Vision for Realizing Robust Housing

ENR Construction

Poirier The 964-bed student housing project in Arcata, Calif., That was the most important directive for the project team on Cal Poly Humboldt’s $195-million student housing project when planning first began in 2022. After two years of construction, the project—Hinarr Hu Moulik East & West Student Housing at St.

article thumbnail

Costain to design underground hydrogen storage facililty

The Construction Index

Costain previously constructed the Stublach solution mining plant near to the planned hydrogen storage facility The Keuper gas storage project (KGSP) is an underground hydrogen storage facility in Northwich, Cheshire. It will consist of 19 salt caverns together with hydrogen treatment, compression, dehydration and transfer facilities.