Remove Ramps Remove Structural Systems Remove Zoning
article thumbnail

Yellowstone River Bridge Sits Tall at Top of Canyon to Improve Safety, Access and Views

ENR Construction

National Park system would come with its own unique set of challenges. Rising 180 ft above the river gorge, the four-span steel plate girder bridge will replace the existing structure, which was built in 1961 and is located just 700 ft to the southeast. The nearly 600 precast deck panels from Plumb Creek Structures in Littleton, Colo.,

article thumbnail

Enhancing the I-5

Civil + Structural Engineer

The steps of this project include: Installing Intelligent Transportation System (ITS) improvements including count stations, closed-circuit television (CCTV), and ramp metering to nine on-ramps. Widening seven existing bridge structures between SR-14 and Parker Road. Reconstructing the Weldon Canyon overcrossing.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Funding Available: U.S. DOT Allocates $3.33 Billion for Community Reconnection

Civil + Structural Engineer

The area around Interstate 90 on the Charles River waterfront in Allston will benefit from removing an elevated bridge structure that divides and cuts off multiple neighborhoods in the area. The large Allston Multimodal Project in Boston received a boost with the receipt of $335 million to support a $1.9 billion multi-modal project.

Ramps 130
article thumbnail

Innovating LXRP’s

Roads Online

For the first time, a new retaining wall system being used in a level crossing removal is set to innovate infrastructure projects across Australia. The integrated counterforts are jointed onsite to a structural concrete footing, which then forms a highly efficient and robust cantilever retaining wall.

article thumbnail

Exploring OSHA’s General Fall Protection Requirements

Safety Services Company

This standard, which was cited 7,250 times in 2012, states all employees working on surfaces 6-feet above lower level with unprotected sides must be protected from falls by through the use of guardrail systems, safety net systems, or personal fall arrest systems. Ramps 1926.501(b)(6). Excavations 1926.501(b)(7)(ii).

article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

Foreign-Trade Zones (FTZs) Program was created in 1934 with the goal of helping businesses in the U.S. According to the National Association of Foreign Trade Zones (NAFTZ), in 2014, goods exported directly from U.S. The value of shipments into zones totaled nearly $660 billion, compared with $798 billion the previous year.

Zoning 75
article thumbnail

196 Construction Grand Rapids: Recent Developments and Future Prospects

Construction Daily News

These help drivers navigate through construction zones and avoid delays. Timeline and Phases The timeline for the I-196 project is structured into two main phases. Ramp closures at major interchanges, like the US-131/I-196 interchange, will also be crucial at the onset. Ramps play a critical role in connecting various routes.